This contract involves the demolition of an existing diesel engine‑generator set and associated plant equipment at the Kwethluk power plant, followed by the installation of a new owner‑furnished 450 kW engine‑generator, charge‑air cooler, 500 kVA transformer, and extensive mechanical and electrical modifications. The work includes piping, wiring, control‑system programming, testing, commissioning, and site clean‑up, funded jointly by the Alaska Energy Authority (state) and the Denali Commission (federal). The contract is a single‑award lump‑sum with a bid opening on 16 July 2025, substantial completion required by 20 Nov 2025, and final completion by 5 Dec 2025.
• Demolition of existing generator set and related mechanical/electrical systems.
• Installation of new engine‑generator, charge‑air cooler, transformer, and upgrades to fuel, hydraulic, ventilation, switchgear, VFDs, and control software.
• Mandatory testing, commissioning, documentation, and compliance with Buy‑America and EEO requirements.