The Fairway Drive and Junction Boulevard Arterial Resurfacing Project is a rehabilitation project consisting of a cape seal rehabilitation over structural digout repairs at Fairway Drive and Junction Boulevard. The project includes repair of signal detection infrastructure, restriping, and other work necessary to and directly related to the structural repair and cape seal operations. The engineer's estimate for the project is $3,890,000. The project was advertised in the Press Tribune on Friday, September 19th, 2025.
• The project involves cape seal rehabilitation over structural digout repairs
• The project includes repair of signal detection infrastructure and restriping
• The engineer's estimate for the project is $3,890,000
• The project was advertised in the Press Tribune on Friday, September 19th, 2025
• The bid submission date was October 28, 2025, at 6:00:00 PM EDT