The Wakulla County Board of County Commissioners awarded a contract to upgrade the existing flashing caution signals at the intersection of MLK Jr. Memorial Road and Spring Creek Highway to a fully operational traffic signal system. The scope includes installing new conduit, signal cabinets, vehicular signal heads, loop detectors, pavement markings, and related electrical work, as detailed in the Basis of Bid. The contract was competitively bid, with Universal Electric of Tallahassee Inc./SMS winning at a total price of $71,866.25. The work must be completed within 90 days of award, with substantial completion required in 75 days. The agency requires the contractor to maintain specified insurance coverages and to be a licensed traffic‑control contractor.
• Upgrade from flashing caution to full traffic signal at a county road intersection.
• Comprehensive installation of conduit, signal cabinets, detectors, and pavement markings.
• Fixed‑price award of $71,866.25, with a 90‑day completion schedule.