This contract involves the demolition and site remediation of a nuisance‑abated, wood‑framed structure located at 1004 Alba Street, Mobile, AL. The City of Mobile’s Municipal Enforcement Department issued a sealed‑envelope RFQ (ME‑154‑18) requiring wet demolition, utility caps, debris removal, erosion‑ and sediment‑control BMPs, and final site stabilization with topsoil, seeding, and mulching. The successful bidder must also comply with Lead‑Based Paint and Asbestos NESHAP requirements, provide photographic documentation, and submit all close‑out paperwork including lien releases and proof of final newspaper notice. The work must be substantially completed within 15 calendar days of a Notice to Proceed, with a liquidated‑damage penalty of $250 per day for late performance.
• Scope: Wet demolition, utility disconnection, debris hauling, BMP installation, final site stabilization.
• Mandatory compliance: LBP/Asbestos handling, Clean Water Act, local storm‑water codes, E‑Verify, insurance, and business‑license requirements.
• Delivery: Sealed‑envelope bid due June 9 2021; award to FREMIN VENTURES, LLC.; performance window ~15 days; final close‑out required before final payment.