The Industrial Court Wastewater Rehabilitation Project involves the rehabilitation of the Industrial Court Wastewater System, including the replacement of approximately 257 LF 8” SDR 35 PVC sewer by open cut and 95 LF 8” SDR 35 PVC Sewer by bore with 15” steel carrier pipe. The project also includes the removal and replacement of 3 existing manholes, and the reconnecting and/or adjusting of existing services. The engineer’s estimated budget for the project is $180,250.00. The project was awarded to the lowest responsive, responsible bidder.
• The project involves wastewater system rehabilitation
• The project includes sewer replacement and manhole removal and replacement
• The engineer’s estimated budget is $180,250.00
• The project was awarded to the lowest responsive, responsible bidder