The City of Bellevue has awarded a contract for the construction of the SE 16th St Walkway. The project involves the removal of structures and obstructions, tree removal, storm drainage improvements, and the construction of a gravity block retaining wall, cement concrete curb and gutter, and ADA ramps. The contract was awarded to multiple vendors, including Kamins Construction, Westwater Construction, and R. W. Scott Construction, among others. The bid tabulation section of the document lists the bids received from each vendor, along with the itemized costs for each component of the project.
• The project involves the construction of a walkway and associated improvements.
• The contract was awarded to multiple vendors.
• The bid tabulation section lists the bids received from each vendor.
• The project involves the removal of structures and obstructions, tree removal, and storm drainage improvements.
• The contract includes the construction of a gravity block retaining wall, cement concrete curb and gutter, and ADA ramps.