The contract awards a single‑award, lump‑sum construction effort to refurbish the interior of the Thrasher‑Horne Center at St. Johns River State College’s Orange Park Campus. The scope focuses on interior finishes—flooring, wall finishes, paint, millwork, and two optional alternates for wall‑molding layouts and carpet with rubber accessories. The winning bid totaled $718,520 and includes base work plus both alternates. The procurement was conducted through a pre‑qualified, invitation‑to‑bid process, with a mandatory pre‑bid meeting on March 3, 2023, bid submission deadline of April 4, 2023, and award announced on April 17, 2023.
• Interior refurbishment covering conference center, grand lobby, and auditorium spaces (flooring, painting, wall‑molding, decorative paneling).
• Two optional alternates: (1) alternate wall‑molding layouts; (2) carpet with rubber trim for auditorium areas.
• Awarded to Thomas May Construction at a total lump‑sum price of $718,520 (base $546,600 + alternates $38,720 + $133,200).