Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Engineering Services
  5. ›Engineering - WWTP Blower Project

Awarded contract·City of Cottonwood·Arizona

Engineering - WWTP Blower Project

Won by Hazen and Sawyer, P.C.$394kSingle Award
Contract source

Awarded vendors

  • Hazen and Sawyer, P.C.

Description

The City of Cottonwood has awarded a contract to Hazen and Sawyer, P.C. for engineering services related to the Mingus Wastewater Treatment Plant blower project. The contract includes services such as design completion, representation on behalf of the City, review of submittals and RFIs, project representative services during construction, material QA test results review, certification of contractor progress payments, and start-up assistance. The contract has a total value of $394,495 and is expected to be completed by June 30, 2025. Key aspects of the contract include the scope of work, compensation, payments, and insurance requirements. The contract also outlines the roles and responsibilities of the City and the consultant, as well as the procedures for termination, amendments, and dispute resolution. Some of the key points from the scope of work include: • The consultant will provide engineering services for the limited construction phase of the Mingus Wastewater Treatment Plant blower project. • The consultant will review laboratory reports and reports of specified Quality Assurance (QA) inspection and testing activities completed by the contractor. • The consultant will certify contractor progress payments and provide start-up assistance. • The consultant will prepare revised Construction Drawings for the Project as actually constructed. The contract requires the consultant to maintain certain types of insurance, including commercial general liability, auto liability, and professional liability. The contract also requires the consultant to indemnify and hold harmless the City and its employees against any claims or liabilities arising out of the consultant's work. Some of the key deliverables from the contract include: • A completed design for the blower project • A report on the results of the QA testing and inspection • A certification of contractor progress payments • A set of revised Construction Drawings The contract has a number of benefits for the City of Cottonwood, including the completion of the blower project, which will improve the City's wastewater treatment capabilities. The contract also provides the City with access to the expertise and resources of Hazen and Sawyer, P.C., a professional engineering firm with experience in wastewater treatment plant design and construction. Overall, the contract between the City of Cottonwood and Hazen and Sawyer, P.C. is an important step in the completion of the Mingus Wastewater Treatment Plant blower project, and will provide the City with the engineering services and expertise needed to ensure the successful completion of the project.

Attached files

Key dates

Starts
4/16/2024
Ends
6/30/2025
Duration
1 year 2 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Engineering Services
NAICS
541330
Solicitation №
2024-020

Contract value

$394,495

The contract value is explicitly stated as $394,495. This value is likely based on the scope of work and the services to be provided by the consultant. The contract includes a detailed breakdown of the costs, including labor, direct expenses, and other costs. The total value of the contract is likely to be the sum of these costs, and is expected to be completed within the specified timeframe. Factors that may influence the likely contract value include the complexity of the project, the expertise and experience of the consultant, and the availability of resources and materials.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Town of Narragansett·Rhode Island

Top match · 71%

Stand-by Generator Replacement - WWTP

Closes 11/6/2026Opened 11/6/2026

U.S. Department Of Defense·United States of America

70% match

28--BLOWER,ENGINE,EAPS, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/16/2026

U.S. Department Of Defense·United States of America

70% match

28--BLOWER,ENGINE,EAPS, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

Cape Fear Public Utility Authority·North Carolina

70% match

BID RESULTS - Wrightsboro Elevated Water Tank Rehabilitation

Closes 11/27/2026Opened 9/23/2026

Village of Johnson·Vermont

69% match

Johnson WWTP Engineer RFP

Closes 11/12/2026Opened 10/14/2026

U.S. Department Of Defense·Kentucky

68% match

WPAFB 3rd Air Stream/ B18

Closes 10/31/2026Opened 10/17/2025

U.S. Department Of Energy·Colorado

68% match

2026 Distributed Wind Turbine Competitiveness Improvement Project

Closes 11/13/2026Opened 9/30/2026

Louisiana City of Mandeville·Louisiana

68% match

WWTP PAA DISINFECTION, CITY PROJECT NO.: 212.26.002

Closes 11/4/2026Opened 9/22/2026

City of Charlotte·North Carolina

67% match

Irwin Creek WWTP Stormwater Improvements Project

Rolling / TBD closeOpened 5/1/2026

Florida State University·Florida

67% match

FSU InSPIRE Climatic Wind Tunnel

Closes 3/1/2027Opened 10/23/2026

City of Wilmington·Delaware

67% match

27019PW – Digester 4 Rehabilitation

Closes 11/17/2026Opened 9/22/2026

City of Bakersfield·California

67% match

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

City of Douglas·Wyoming

67% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Burlington·Vermont

67% match

Proposals for the replacement of aeration blower for the City's North Wastewater Facility

Closes 11/6/2026Opened 10/14/2026

Georgia Macon Water Authority·Georgia

67% match

AWTP-(2) 1000 Hp Reservoir Vertical Turbine

Closes 11/17/2026Opened 10/2/2026

City of Douglas·Wyoming

67% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

U.S. Department Of Energy·Colorado

67% match

2026 Distributed Wind Turbine Competitiveness Improvement Project

Closes 11/13/2026Opened 9/30/2026

Palm Beach County Water Utilities Department·Florida

67% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 9/23/2026

New York City Department of Environmental Protection·New York

67% match

82625B0045-BWT-BB-236 Replacement of the Cyclone Degritters and Grit Washers at the Bowery Bay WWTP

Closes 11/12/2026Opened 9/28/2026

City of Appleton·Wisconsin

67% match

WTP BOILER REPLACEMENT

Closes 12/2/2026Opened 10/23/2026

City of Cincinnati - Purchasing Division·Ohio

66% match

Polk Run WWTP Anaerobic Selector (10280726)

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·Maryland

66% match

W912DR26X1B2N

Closes 1/8/2027Opened 1/8/2026

Massachusetts Town of Holliston·Massachusetts

66% match

WWTP Yard Piping Phase 1D

Closes 11/12/2026Opened 10/21/2026

West Virginia Parkways Authority·West Virginia

66% match

One (1) Tennant 800 Large Industrial Sweeper or Equal

Closes 11/2/2026Opened 10/19/2026