The Palm Beach County Water Utilities Department (PBCWUD) is seeking a design‑build partner to deliver new electrical infrastructure for the Western Region Wastewater Treatment Facility (WRWWTF) in Belle Glade, FL. The scope includes engineering, permitting, and construction of two new electrical buildings—a Main Electrical Building and a Deep Injection Well (DIW) Electrical Building—consolidating existing equipment, installing new switchgear, generators, HVAC, fire protection, and associated site work. The project will be executed under a 27‑month schedule with a total estimated construction cost of roughly $23 M.
• Design‑build delivery for two new electrical structures (Main Electrical Building & DIW Electrical Building)
• Consolidation of existing electrical rooms, generators, and VFDs into new facilities
• Installation of arc‑resistant switchgear, 1,000 kW generators, HVAC (VRF), fire‑alarm, and access‑control systems
• Site civil work including foundations, elevated slabs, storm‑water management, and utility relocations
• Compliance with Florida Building Code, FEMA flood guidelines, and PBCULDC requirements
• Estimated construction budget ≈ $23 M; design‑build contract anticipated to span 27 months.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.