Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Florida guideFlorida Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Engineering Services
  5. ›WRWWTF Electrical Building Progressive Design-Build

Palm Beach County Water Utilities Department·Florida

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026$10M – $12MRequest for Proposal
Get bids like this by emailBid source

Description

The Palm Beach County Water Utilities Department is seeking a design‑build partner to construct two new electrical facilities at the Western Region Wastewater Treatment Facility (WRWWTF) in Belle Glade, FL. The scope includes: • Design and construction of a new Main Electrical Building consolidating existing electrical rooms, generators, and fuel storage. • Design and construction of a new Deep Injection Well (DIW) Electrical Building with air‑conditioned space for VFDs and associated equipment. • Provision of site civil work, storm‑water management, flood‑elevation compliance, structural concrete and masonry, electrical distribution, fire‑protection, HVAC (VRF system), and associated controls. • Estimated project schedule of 27 months with a total construction budget of approximately $11.5 million. • Required elevations of 19 ft NAVD88 to meet local flood‑resilience guidelines. • No process equipment, parking, or additional landscaping is included. • The contractor will be responsible for detailed design, permitting, construction, testing, and commissioning of both buildings. • New Main Electrical Building (concrete & masonry structure, generator, switchgear, arc‑resistant equipment). • New DIW Electrical Building (air‑conditioned, housing VFDs for pump station). • Electrical distribution upgrades, new lighting, fire alarm, access control, and lightning protection. • Site utilities relocation, earthwork, and paving. • Project located at 2055 W. Canal St., Belle Glade, FL (19‑acre site).

Attached files

Contact

Henry Melendez(Buyer)

[email protected]

(561) 493-6120

Key dates

Opened
10/1/2026
Closes
11/12/2026
Duration
27 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP-720-WUD 26-014R-3

Budget estimate

$10,000,000 – $12,000,000

The Basis of Estimate section lists a total project cost of approximately $11,459,441. Assuming the agency awards the contract to a single design‑build firm, the contractor’s revenue would be in that range. Factors that could shift the final amount include changes in scope, contingency usage, and any value‑engineering adjustments. A reasonable estimate is a low end of $10 million (if some contingencies are reduced) and a high end of $12 million (if additional site work or equipment upgrades are required).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Palm Beach County Water Utilities Department·Florida

Top match · 99%

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/16/2026

Palm Beach County Water Utilities Department·Florida

98% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 9/23/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

82% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 10/28/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

82% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/14/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

82% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/21/2026

City of Virginia Beach·Virginia

81% match

COVB-26-101639-2 - Central Resort District Drainage Improvement Phase 1 Design-Build

Closes 11/5/2026Opened 10/23/2026

City of Cincinnati·Ohio

81% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 9/16/2026

Pinellas County·Florida

80% match

Design and Construction of Power Distribution Center at the County Solid Waste Disposal Complex - Design Build (Rebid)

Closes 12/1/2026Opened 10/30/2026

Citrus County, Florida·Florida

80% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

Orange County, Florida·Florida

80% match

DESIGN BUILD - ORANGE COUNTY CONVENTION CENTER NORTH - SOUTH BUILDING CHILLED WATER SYSTEM UPGRADE

Closes 11/5/2026Opened 9/14/2026

Charles County Government·Maryland

79% match

MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)

Closes 11/9/2026Opened 7/8/2026

City of Wilmington·Delaware

79% match

25035PW-R – Porter Water Filter Plant Electrical Upgrade Project

Closes 11/3/2026Opened 10/8/2026

Sun 'n Lake Improvement District·Florida

79% match

Wastewater Treatment Plant Progressive Design-Build Services

Closes 11/20/2026Opened 10/19/2026

Fort Pierce Utilities Authority·Florida

79% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

Fort Bend County Municipal Utility District No. 219C·Texas

79% match

Wastewater Treatment Plant No. 1 -Phase 1 (0.15 MGD) Lease to serve Fort Bend County Municipal Utility District No. 219C

Closes 11/5/2026Opened 10/16/2026

Western Virginia Water Authority·Virginia

79% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Johnson County Wastewater·Kansas

79% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

City of Eureka Springs·Arkansas

79% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

City of Cincinnati·Ohio

79% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 9/16/2026

Oregon Clackamas County·Oregon

78% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026

City of Fort Myers·Florida

78% match

Michigan Avenue Utility Improvement Project

Closes 11/3/2026Opened 9/24/2026

City of Watsonville·California

78% match

River Park Electrical Relocation

Closes 11/5/2026Opened 10/5/2026

Lorain County·Ohio

78% match

RFQ - Design and Engineering Services

Closes 11/6/2026Opened 10/6/2026

City of Troy, OH·Ohio

78% match

Miami Shores Golf Course Pump Control Panel and Well Project

Closes 11/4/2026Opened 10/14/2026