Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Virginia guideVirginia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Virginia
  4. ›Engineering Services
  5. ›COVB-26-101639-2 - Central Resort District Drainage…

City of Virginia Beach·Virginia

COVB-26-101639-2 - Central Resort District Drainage Improvement Phase 1 Design-Build

Closes in 4 days$700k – $1.5MRequest for Proposal
Get bids like this by emailBid source

Description

The City of Virginia Beach is seeking a design‑build contractor to execute Phase 1 of the Central Resort District Drainage Improvement project. This effort focuses on engineering design, permitting, and construction of new storm‑water drainage infrastructure to alleviate flooding and improve water quality in the designated resort district. The scope includes detailed hydraulic modeling, utility coordination, environmental compliance, and construction of drainage conveyance systems, culverts, and related structures. • Design‑build services for new storm‑water drainage improvements (hydraulic analysis, plans, specifications). • Coordination with local utilities, permitting agencies, and environmental regulators. • Construction of drainage infrastructure, including culverts, channels, and related structures, to mitigate flooding. • Deliverables include complete design documents, construction drawings, and as‑built records. • Project must be completed within the contractual timeframe set by the city.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lakesha Bryant

Key dates

Opened
10/23/2026
Closes
11/5/2026

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP-130669

Budget estimate

$700,000 – $1,500,000

Based on typical design‑build drainage projects of a municipal scale, Phase 1 is likely to fall in the low‑to‑mid‑million‑dollar range. The design component alone can run $400‑800 k, while the construction of drainage structures for a limited district often adds $300‑700 k. Consequently, total contract value is estimated between roughly $700 k and $1.5 M, depending on final engineering detail, site conditions, and material costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Virginia Beach·Virginia

Top match · 85%

COVB-27-101729 - Annual Service Contract for Stormwater Engineering Services

Closes 12/11/2026Opened 10/27/2026

Western Virginia Water Authority·Virginia

84% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

City of Norfolk·Virginia

84% match

CSRM Phase 1A Floodwall Construction - Preload & Wick Drains

Closes 11/5/2026Opened 9/29/2026

Western Virginia Water Authority·Virginia

84% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Town of South Hill·Virginia

84% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

City of Charlotte·North Carolina

84% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

City of Charlotte·North Carolina

83% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

Maryland Department of Transportation·Maryland

83% match

MD 249 (Piney Point Road) from Thomas Road to Stark Drive -Drainage Improvements -Design-Build

Closes 11/17/2026Opened 9/29/2026

City of Cape Canaveral·Florida

83% match

Fillmore Avenue Townhomes Stormwater Construction

Closes 11/5/2026Opened 10/8/2026

City of North Miami Beach·Florida

83% match

INVITATION TO BID: Highland Village Stormwater Improvements Project (Phase 1)

Closes 11/24/2026Opened 9/30/2026

City of Charlotte·North Carolina

83% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

City of Charlotte·North Carolina

82% match

Chatham Storm Drainage Improvement Project

Rolling / TBD closeOpened 6/15/2027

Covington Municipality·Rhode Island

82% match

088-26-GREEN INFRASTUCTURE STORMWATER PROJECT DESIGN

Closes 11/2/2026Opened 11/2/2026

City of Charlotte·North Carolina

82% match

Laurel Avenue Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2027

City of Charlotte·North Carolina

82% match

2500 Briargrove Dr. Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/1/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

82% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 10/23/2026

City of Charlotte·North Carolina

82% match

Arbor Pointe Dr 3201 Storm Drainage Improvement Project

Rolling / TBD closeOpened 1/4/2027

City of Charlotte·North Carolina

82% match

Hastings Princeton Storm Drainage Improvement Project

Rolling / TBD closeOpened 9/15/2027

City of Charlotte·North Carolina

82% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

City of Lynchburg·Virginia

82% match

CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

City of North Charleston·South Carolina

82% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

City of North Charleston·South Carolina

82% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

Maryland Chevy Chase Village·Maryland

81% match

Belmont Ave.Extended (Buffer) Drainage Project

Closes 11/13/2026Opened 9/30/2026

Orange County, Florida·Florida

81% match

Bonnie Brook Subdivision Drainage Improvements Engineering Design Services

Closes 11/17/2026Opened 10/15/2026

St. John the Baptist Parish Government·Louisiana

81% match

Bid 2026.23 Culverts and Drainage Improvements Project

Closes 11/19/2026Opened 10/21/2026