Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Florida
  4. ›Construction
  5. ›WRWWTF Electrical Building Progressive Design-Build

Palm Beach County Water Utilities Department·Florida

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026$10M – $15MRequest for Proposal
Get bids like this by emailBid source

Description

The Palm Beach County Water Utilities Department (PBCWUD) is seeking a design‑build partner to deliver two new electrical facilities for the Western Region Wastewater Treatment Facility (WRWWTF) in Belle Glade, FL. The scope includes: • Design and construction of a new Main Electrical Building consolidating existing electrical rooms, generator, and fuel storage. • Design and construction of a new Deep Injection Well (DIW) Electrical Building with air‑conditioned enclosure for VFDs. • Provision of site civil improvements, stormwater controls, flood‑elevation compliance, and utility relocations. • Installation of arc‑resistant switchgear, generators (2 × 1,000 kW), new lighting, fire alarm, access control, camera system, and lightning protection. • Full project schedule of approximately 27 months with a total estimated construction cost of roughly $11.5 million. • Consolidates aging electrical infrastructure into two modern, flood‑resilient buildings. • Includes HVAC (VRF system), positive‑pressure units, and comprehensive electrical distribution upgrades. • Requires coordination with local jurisdiction (City of Belle Glade) for site‑plan modifications and permits. • Emphasizes future expansion capacity (25 % additional space) and compliance with Florida Building Code and FEMA flood standards.

Attached files

Contact

Henry Melendez(Buyer)

[email protected]

(561) 493-6120

Key dates

Opened
10/16/2026
Closes
11/12/2026
Duration
27 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238210
Solicitation №
RFP-720-WUD 26-014R-4

Budget estimate

$10,000,000 – $15,000,000

The Basis of Design Report lists a total direct cost of $11,459,441 and a total project budget (including contingencies, insurance, and fees) of roughly $21,244,875. Assuming the client would be awarded the full design‑build contract, the expected revenue would be in the low‑$10 million to mid‑$12 million range for the construction portion, with additional design fees potentially bringing the total to $13 – $15 million. Factors influencing the final budget include the final negotiated scope, any change orders, and the firm’s fee structure (fixed‑price vs. cost‑plus).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Palm Beach County Water Utilities Department·Florida

Top match · 99%

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/1/2026

Palm Beach County Water Utilities Department·Florida

99% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 9/23/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

82% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 10/28/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

82% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/14/2026

Metropolitan Sewer District of Greater Cincinnati·Ohio

81% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 10/21/2026

City of Cincinnati·Ohio

80% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/10/2026Opened 9/16/2026

Orange County, Florida·Florida

79% match

DESIGN BUILD - ORANGE COUNTY CONVENTION CENTER NORTH - SOUTH BUILDING CHILLED WATER SYSTEM UPGRADE

Closes 11/5/2026Opened 9/14/2026

City of Wilmington·Delaware

79% match

25035PW-R – Porter Water Filter Plant Electrical Upgrade Project

Closes 11/3/2026Opened 10/8/2026

Pinellas County·Florida

79% match

Design and Construction of Power Distribution Center at the County Solid Waste Disposal Complex - Design Build (Rebid)

Closes 12/1/2026Opened 10/30/2026

City of Cincinnati·Ohio

79% match

LMWWTP High-Rate Treatment Facility Progressive Design Build

Closes 11/4/2026Opened 9/16/2026

City of Virginia Beach·Virginia

79% match

COVB-26-101639-2 - Central Resort District Drainage Improvement Phase 1 Design-Build

Closes 11/5/2026Opened 10/23/2026

Citrus County, Florida·Florida

79% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

City of Eureka Springs·Arkansas

79% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

Sun 'n Lake Improvement District·Florida

78% match

Wastewater Treatment Plant Progressive Design-Build Services

Closes 11/20/2026Opened 10/19/2026

Johnson County Wastewater·Kansas

78% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

Charles County Government·Maryland

78% match

MWWTP Effluent FM Surge & Transient Design Build Services (UN 1282)

Closes 11/9/2026Opened 7/8/2026

Fort Pierce Utilities Authority·Florida

78% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

Western Virginia Water Authority·Virginia

78% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Fort Bend County Municipal Utility District No. 219C·Texas

77% match

Wastewater Treatment Plant No. 1 -Phase 1 (0.15 MGD) Lease to serve Fort Bend County Municipal Utility District No. 219C

Closes 11/5/2026Opened 10/16/2026

Town of Queen Creek·Arizona

77% match

Design/Build - Industrial Wastewater Treatment Facility

Closes 12/8/2026Opened 10/22/2026

City of Tuscaloosa·Alabama

77% match

Hilliard N. Fletcher WRRF Phase III Improvements

Closes 12/8/2026Opened 10/26/2026

Renewable Water Resources (ReWa)·South Carolina

77% match

Georges Creek WRRF EQ Upgrades Division I RFB

Closes 11/2/2026Opened 10/2/2026

Oregon Clackamas County·Oregon

77% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026

Lorain County·Ohio

77% match

RFQ - Design and Engineering Services

Closes 11/6/2026Opened 10/6/2026

Orange County, Florida·Florida

77% match

Bonnie Brook Subdivision Drainage Improvements Engineering Design Services

Closes 11/17/2026Opened 10/15/2026