The contract is for the construction of a salt storage building at the South Chagrin Reservation. The bid was opened on February 16, 2017, and the estimated cost of the project is $75,000. The bid tabulation form lists the bids from various vendors, with the lowest bid being $76,480.00 from Miller Builders. The scope of work includes the construction of the salt storage building, and the contract type is lump sum.
• The bid was publicly opened and read by the Cleveland Metroparks Purchasing Division.
• The bid results were recorded by the Cleveland Metroparks Purchasing Division.
• The contract is expected to be awarded to the lowest bidder, Miller Builders.
• The project is expected to be completed within a certain timeframe, although the exact duration is not specified.
• The contract includes a bond requirement, and the vendors are required to provide a certified check or cashier's affidavit.
• The contract also includes a tax deduction requirement, and the vendors are required to provide a tax exemption certificate.