The contract is for the design and construction of a pre-engineered metal building (PEMB) at California Polytechnic State University, San Luis Obispo. The project includes demolition, trenching, backfill, concrete work, relocation of a compressor, and installation of all systems as described in the contract documents. The contract was awarded to Maino Construction Company, Incorporated, with a total bid amount of $768,566. The project has a duration of 114 calendar days from the construction start date. The contract requires the contractor to achieve 3% DVBE participation and provides a DVBE bid incentive for bidders that propose sufficient additional DVBE participation.