Virginia Tech is seeking a contractor to design‑build a single‑story, pre‑engineered metal building of approximately 3,740 ft² for its Forestry Research Operations Center. The facility will house workshop areas, storage, and two vehicle service bays, and will include all associated mechanical, electrical, plumbing, fire‑protection, and site‑work systems. The solicitation is a lump‑sum, non‑capital IFB with a sealed‑bid deadline of 23 Nov 2026 and an optional pre‑bid conference on 4 Nov 2026. No contract value is disclosed; the contractor must coordinate multiple trades and comply with Virginia state building codes, ADA, and Virginia Tech’s specific standards.
• Construct a pre‑engineered metal building (≈3,740 ft²) with foundation, slab, and structural steel.
• Provide complete MEP, fire‑protection, and site‑work (grading, utilities, paving, erosion control).
• Deliver all required documentation, permits, and testing; meet substantial completion by 30 Jun 2027 and final completion by 30 Jul 2027.
• Follow detailed drawings and specifications (architectural, structural, civil, mechanical, plumbing, electrical) supplied in the IFC package.