The contract is for the renovation of two existing restrooms located inside the Elmer Reed General Aviation Terminal at the Draughon Miller Central Texas Regional Airport. The scope of work includes the renovation of the restrooms, with a total base bid of $18,650.00 for Cody Stanley Construction and $34,998.00 for Camden Enterprises LLC. The contract also includes three alternates, with bids ranging from $1,500.00 to $13,360.00. The contract was awarded to the bidders based on their bids, with Cody Stanley Construction being recommended for council award.
• The contract is for the renovation of two existing restrooms.
• The scope of work includes the renovation of the restrooms.
• The total base bid for Cody Stanley Construction is $18,650.00.
• The total base bid for Camden Enterprises LLC is $34,998.00.
• The contract includes three alternates.
• The contract was awarded to the bidders based on their bids.