The contract is for the replacement of culvert pipes at 84 locations throughout the City of Palm Bay's Port Malabar Unit 31. The project includes the removal, disposal, re-installation, and restoration of the culvert pipes, as well as utility relocations, material furnishings, and restoration work. The contract was awarded to Timothy Rose Contracting for an amount of $898,263.44.
• The project is a turnkey project, meaning that the contractor is responsible for all aspects of the project.
• The contractor is required to perform a pre-construction video to document existing conditions of each location prior to mobilization.
• The contractor is responsible for all Maintenance of Traffic (MOT) costs required for the project.
• The contract includes the furnishing of plans to the City for review and approval.