The contract is for the remodel of the server room at William Jewell College. The scope of work includes the removal of old HVAC units, installation of new HVAC units, installation of a new FM200 or ECARO-25 fire suppression system, patching, sealing, and painting of walls, ceiling tiles, and doors, and the removal of asbestos-containing flooring and installation of new engineered hardwood flooring. The contract was awarded to three vendors: MWD Construction, Southtown Glass, Inc., and U.S. Engineering Construction, LLC. The grand total for the contract is $149,970.06 for MWD Construction, $150,630.00 for Southtown Glass, Inc., and $43,848.00 for U.S. Engineering Construction, LLC.
• The contract includes the removal and replacement of HVAC units
• The contract includes the installation of a new fire suppression system
• The contract includes patching, sealing, and painting of walls, ceiling tiles, and doors
• The contract includes the removal of asbestos-containing flooring and installation of new engineered hardwood flooring
• The contract was awarded to three vendors