The City of Worcester is contracting a comprehensive resurfacing of multiple streets (M24‑1) within its limits. The work includes clearing & grubbing, excavation, placement of reclaimed pavement and new Superpave hot‑mix asphalt (9.5 mm and 12.5 mm Level 2), curb installation, sidewalk and driveway concrete repairs, drainage structure adjustments, traffic signage, and lighting conduit work. The contract also contains a $370,000 lump‑sum reserve for unforeseen conditions and requires 5 % bid security, performance and payment bonds, and full compliance with Massachusetts prevailing‑wage and MWBE goals. The awardee, A.F. Amorello, submitted a winning bid of approximately $3.8 M, with the estimated total project cost listed at $6.1 M. The project must be substantially completed by 27 June 2025, with final completion no later than 30 days thereafter.