This contract concerns the design, delivery, installation, and related site work for one or more portable classroom units at Washington Elementary School in San Gabriel, California. The work includes demolition of existing pavement and site features, protection of existing utilities and trees, installation of dry‑utility trenches, and the placement and anchoring of modular classroom structures, all in compliance with California prevailing‑wage, safety, and building‑code requirements. The district required mandatory job‑walk attendance, 10 % bid security, and 100 % performance and payment bonds. Four contractors were listed on the award form, indicating a possible multiple‑award structure or subcontractor allocation.
• Scope covers demolition, utility protection, concrete paving (pedestrian‑type, 24‑in. rebar spacing), and portable building installation.
• Prevailing‑wage and payroll reporting are mandatory; bonds and insurance must meet state specifications.
• The project is funded as a fixed‑price public‑works contract with an anticipated twelve‑month performance period.