The City of Palm Bay is seeking contractors for the TS Fay NRCS Projects - Pipe Replacement/Extension. The project consists of four locations throughout the city requiring various permanent repairs, including the replacement of pipes, excavation, and demolition. The contract was awarded to multiple vendors, and the total price for each vendor varies. The project includes the replacement of pipes, excavation, and demolition at four locations: Haftez Street @ Drainage R/W, Edison Street Outfall @ Canal 27, Vin Rose Circle Cross Drain, and Canal 20 @ Canal 10.
• The project involves the replacement of pipes with new ones, including 42" Corrugated Aluminum Pipe and 48" Corrugated Poly. Pipe.
• The project also includes excavation and demolition, bedding stone, filter fabric, backfill, compaction, and sod.
• The contract was awarded to multiple vendors, with prices ranging from $96,522.47 to $193,343.22.
• The project is located in Palm Bay, Florida, and the city is seeking contractors to complete the work.
• The contract includes a list of items, including mobilization, maintenance of traffic, staked silt fence, excavation and demolition, bedding stone, pipe, filter fabric, backfill, compaction, and sod.