Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Manufacturing
  5. ›Stainless Steel and Copper Pipe and Tubing

Awarded contract·City of Tucson·Arizona

Stainless Steel and Copper Pipe and Tubing

Won by RECO (Robbins Equipment Company)$2.5MSingle Award
Contract source

Awarded vendors

  • RECO (Robbins Equipment Company)

Description

The City of Tucson has awarded a contract to RECO (Robbins Equipment Company) for the supply of stainless steel and copper pipe and tubing. The contract has a term of 3 years, with an option to renew. The vendor will provide the materials on an as-needed basis, with the City requesting quotes from the vendor as needed. The contract includes specifications for the materials, including the type of pipe and tubing, and the requirements for delivery and payment. The City has the option to terminate the contract if the vendor fails to meet the requirements of the contract. • The contract includes a pricing table with estimated annual quantities and unit prices for the materials. • The vendor is required to provide complete manufacturers' descriptive literature regarding the product they propose to furnish. • The contract includes a provision for the vendor to provide a rebate to the City in the form of a percentage of sales based on the sales of other agencies that piggyback on the contract. • The contract includes a provision for the vendor to provide a discount on all items based on volume. • The contract includes a provision for the vendor to provide delivery within 7 days and hotshot same-day service.

Attached files

Key dates

Starts
3/14/2024
Ends
3/13/2027Renews
Duration
3 years

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Manufacturing
NAICS
423510
Solicitation №
240074 - 04

Contract value

$2,500,974

The contract value can be estimated based on the pricing table provided in the contract. The total estimated annual cost for the materials is $824,878.00 for copper pipe and tubing, and $8,780.00 for stainless steel pipe. The contract has a term of 3 years, so the total estimated value of the contract can be estimated to be around $833,658.00 per year, for a total of $2,500,974.00 over the 3-year term. However, this is just an estimate and the actual value of the contract may vary based on the actual quantities of materials purchased.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Homeland Security·Maryland

Top match · 69%

PIPE/TUBING

Closes 11/12/2026Opened 10/28/2026

NYS Olympic Regional Development Authority·New York

68% match

Pipe , Culvert, Valves, and Fittings

Closes 4/29/2027Opened 4/8/2026

City of San Antonio·Texas

66% match

6100019820 Carbon Steel Pipe and Accessories

Closes 11/13/2026Opened 10/28/2026

Connecticut Town of Waterford·Connecticut

65% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES

Closes 11/12/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

65% match

UNION,PIPE

Closes 11/6/2026Opened 10/20/2026

City of Tampa·Florida

64% match

4" - 6" Ductile Iron Pipe (Bid Discount)

Closes 11/6/2026Opened 9/24/2026

U.S. Department Of Energy·New York

64% match

Seamless 21-6-9 Tubing

Closes 11/10/2026Opened 10/28/2026

Town of Waterford·Connecticut

63% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES FY27 ROPE FERRY ROAD (STATE ROAD)

Closes 11/12/2026Opened 10/16/2026

Palm Beach County – Facilities Development & Operations·Florida

63% match

PIPE & FITTINGS, DUCTILE IRON, PURCHASE OF, PRE-QUAL, CTYWD

Closes 5/4/2031Opened 7/1/2026

U.S. Department Of Defense·Oklahoma

63% match

47--TUBE,METALLIC

Closes 11/5/2026Opened 10/26/2026

City of Redlands·California

63% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Irving·Texas

63% match

Sale of Scrap Brass, Meters and Copper

Closes 11/12/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

63% match

47--PIPE,METALLIC

Closes 11/8/2026Opened 10/29/2026

Texas City of San Antonio·Texas

63% match

ANNUAL CONTRACT FOR CARBON STEEL PIPE AND ACCESSORIES FOR PUBLIC WORKS DEPARTMENT

Closes 11/13/2026Opened 10/28/2026

Bristol Virginia Utilities Authority·Virginia

62% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

City of San Bernardino·California

62% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

62% match

CONSUMABLES PIPE WRAP THREAD SEALANT MATERIAL DROP PIPE REPAIR

Closes 11/9/2026Opened 10/28/2026

Richland School District Two·South Carolina

62% match

Plumbing Supplies and Fixtures

Closes 1/6/2030Opened 12/10/2025

North Carolina Orange Water & Sewer Authority·North Carolina

61% match

Construction

Closes 11/10/2026Opened 10/19/2026

U.S. Department Of Defense·Illinois

61% match

STEEL TUBE

Closes 11/9/2026Opened 10/30/2026

City of Marysville, Ohio·Ohio

61% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of Newberg·Oregon

61% match

NBG Pipe 2026

Closes 11/10/2026Opened 10/20/2026

U.S. Department Of Defense·Pennsylvania

61% match

TUBE

Closes 11/19/2026Opened 10/20/2026

Connecticut UConn Health Center·Connecticut

61% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

61% match

47--PIPE ASSEMBLY,METAL

Closes 11/4/2026Opened 10/25/2026