Awarded vendors
- John Madonna Construction Co., Inc.
- Raminha Construction, Inc.
- Souza Engineering Contracting, Inc.
- Whitaker Construction Group, Inc.
- Tierra Contracting, Inc.
- R. Burke Corporation
- Sansone Company, Inc.
- Hemet Manufacturing Company, Inc.
Description
The Kansas and Oklahoma Avenue Waterline Improvement Project involves the construction of a new water line at the County Operations Center in San Luis Obispo, California. The project includes the installation of approximately 632 linear feet of 10-inch potable water pipeline and appurtenances, as well as tie-ins to existing 8-inch water lines at two locations. The project also includes asbestos cement pipe handling, pipe fittings, coupling, adapters, thrust blocks/restraint, installation of gate valves, pipe trenching, backfill, pavement restoration, water pollution control, traffic control, and other related work. The engineer's estimate for the project is $218,970.00. The contract was awarded through a formal bid process, and the bid results are included in the provided text.
• The project involves the construction of a new water line and appurtenances.
• The project includes tie-ins to existing 8-inch water lines at two locations.
• The project includes asbestos cement pipe handling and other related work.
• The engineer's estimate for the project is $218,970.00.
• The contract was awarded through a formal bid process.