This contract is for the construction of storm water/erosion control at the NMSU Carlsbad campus. The project includes the installation of storm water management systems and erosion control measures to prevent storm water runoff and erosion on the campus. The contract was awarded to Constructors, Inc. (N.S.L.) with a total bid of $650,160.00. The project duration is 180 calendar days from the notice to proceed.
• The project includes the installation of storm water management systems and erosion control measures.
• The contract was awarded through an Invitation to Bid (ITB) process.
• The project is located at the NMSU Carlsbad campus.
• The contract includes a 5% bid bond and a performance bond.
• The contractor is required to comply with all applicable state laws and regulations.