The contract is for Collaborative Design-Build Services for the Kennedy Library Renovation at Cal Poly San Luis Obispo. The project involves a two-phased process, with Phase 1 focusing on design and preconstruction services and Phase 2 focusing on design-build construction services. The contract value is budgeted at $55,000,000.00. The scope of work includes replacement of the mechanical system, seismic upgrade of the roof diaphragm and column strengthening, new fire sprinkler, alarm and smoke evacuation systems, roof replacement, elevator upgrades, telecommunication infrastructure improvements, relocation of the main stair, installation of a glass roof over the Atrium, new exterior glazing, LED lighting retrofit, interior renovation, accessibility upgrades, new furniture, and associated demolition and abatement.
• The project is a collaborative design-build project, with the design-builder selected based on qualifications and proposed fees.
• The project involves a two-phased process, with separate agreements for each phase.
• The contract value is budgeted at $55,000,000.00.
• The scope of work includes a range of renovation and upgrade activities.
• The project requires prequalification with the Trustees, with respondents needing to submit prequalification applications no less than ten business days prior to the SOQ submittal due date.