This contract is for the construction of a 250,000-gallon leachate storage tank and supporting infrastructure at the Kiefer Landfill in Sacramento, California. The contract was awarded to TSI Engineering, Inc. for a total amount of $1,047,702. The project is expected to start in October 2020 and be completed by March 2021. The scope of work includes excavation and grading of the leachate tank location, construction of the secondary containment berm, and installation of leachate control system components. The project will provide significant operation and backup storage to the leachate system, reducing the need for expensive frac tanks and justifying the cost of the leachate tank in less than two years. Key features of the project include:
• Construction of a 250,000-gallon leachate storage tank
• Excavation and grading of the leachate tank location
• Construction of the secondary containment berm
• Installation of leachate control system components
• Reduction of the number of expensive frac tanks needed
• Justification of the cost of the leachate tank in less than two years