This contract awards the City of Prescott the complete reconstruction of Stetson Road, encompassing removal of existing pavement, curb, gutter, sidewalk, and utility components, followed by installation of new 4‑in. asphalt pavement, concrete curb‑and‑gutter, drainage improvements, and utility adjustments. The scope also includes a comprehensive storm‑water pollution prevention plan, traffic‑control services, and required bonding and insurance.
• Full‑depth pavement removal and replacement with fiber‑reinforced asphalt mix.
• Installation of diverse concrete curb, gutter, and ramp types per local specifications.
• Drainage upgrades: HDPE pipe, catch basins, rip‑rap, bioretention basin, and related structures.
• Mandatory pre‑bid conference, strict RFI schedule, and a 120‑day construction window starting late April 2025.