Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Construction
  5. ›W Sunset Dr and Barstow St Bridge Sealing and Rehab-BT.pdf

Awarded contract·City of Waukesha·Wisconsin

W Sunset Dr and Barstow St Bridge Sealing and Rehab-BT.pdf

$292kSingle Award
Contract source

Description

This solicitation covers the rehabilitation and sealing of two municipal bridges (W Sunset Drive and Barstow Street) in Waukesha, WI. The scope includes traffic control, inlet protection, deck surface cleaning, protective treatments, epoxy joint and crack sealing, methacrylate flood sealing, low‑viscosity crack sealing, and pavement marking. Optional alternates add demolition, removal of existing curb/sidewalk/roadway, and new concrete pavement, curb, gutter, and sidewalk work. Bids were submitted by Norcon Corporation and Zignego Company, Inc., with base‑bid totals ranging from roughly $108 k to $162 k and potential contract values (including alternates) up to $256 k–$292 k. The bid deadline was 04 / 10 / 2026 11:00 AM CDT, and liquidated damages of $500 per day per bridge are specified.

Attached files

Key dates

Bids closed
4/10/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237120

Contract value

$292,000

The document provides explicit cost figures for each vendor’s bid. Norcon’s combined base bid is $108,303; Zignego’s combined base bid is $161,828. When alternates are added, total potential values rise to $255,585 (Norcon) and $291,741 (Zignego). Since no award has been made, the contract’s likely value will fall within this range. A reasonable estimate for the awarded contract (assuming the lower‑priced bidder wins) would be around $110 k for the base scope, with the possibility of additional work pushing the total toward $260 k. Considering typical municipal budgeting and the presence of optional alternates, an average expected contract value can be approximated at $250 k.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Norfolk·Virginia

Top match · 73%

Virginia Beach Blvd Over NS RR Bridge Rehabilitation

Closes 11/16/2026Opened 10/2/2026

New York City Department of Transportation·New York

71% match

BID EXTENSION: COMPONENT REHABILITATION OF 8 BRIDGES IN THE BOROUGH OF BROOKLYN

Rolling / TBD closeOpened 4/3/2020

LA Public Works Engineering Bureau·California

71% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

Massachusetts Department of Transportation·Massachusetts

71% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

City of Rancho Cordova·California

71% match

Bridge Preventative Maintenance Repair At Horn Road

Closes 11/2/2026Opened 10/8/2026

California Department of Transportation·California

70% match

Temp bridge, deck portion Repl, hang conduit, & polyester Conc overlay

Closes 11/4/2026Opened 9/28/2026

California Department of Transportation·California

70% match

Clairemont drive bridge deck repair.

Closes 12/1/2026Opened 10/5/2026

Georgia City of Chattahoochee Hills·Georgia

70% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

California Department of Transportation·California

70% match

Bridge work, erosion control, and lighting system.

Closes 11/5/2026Opened 10/5/2026

City of Vernon·California

70% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

Oregon Department of Transportation·Oregon

70% match

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

70% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

Illinois Tollway·Illinois

70% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Virginia Department of Transportation·Virginia

70% match

B35_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026

Hardin County·Kentucky

69% match

Horseshoe Bend Road Bridge Repairs

Closes 11/2/2026Opened 10/22/2026

City of Ormond Beach - Purchasing Office·Florida

69% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

NYS OGS Design & Construction - Construction Contractors·New York

69% match

Rehabilitate Floodwalls – Project 46196‑C (Cheektowaga, NY)

Closes 11/18/2026Opened 10/13/2026

West County Wastewater·California

69% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

Nevada Government·Nevada

69% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026