The City of Keene is replacing eight existing flow control gates at the wastewater treatment facility. The contractor shall furnish all labor, equipment, and materials necessary to furnish, install, and construct. The project also includes the demolition of the existing chlorinated water spray foam piping in both Aeration Basins. The contract was awarded to Scherbon Consolidated Inc. for a total of $91,403.
• The project is scheduled to start in July 2021.
• The contractor is responsible for furnishing all labor, equipment, and materials.
• The project includes the demolition of the existing chlorinated water spray foam piping.
• The contract was awarded for a total of $91,403.