Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›CSA-18 Settling Ponds - Liner Replacement Project - San…

Awarded contract·County of San Luis Obispo·California

CSA-18 Settling Ponds - Liner Replacement Project - San Luis Obispo, CA

Won by Raminha Construction Inc$298kSingle Award
Contract source

Awarded vendors

  • Raminha Construction Inc

Description

The County of San Luis Obispo is seeking a contractor to rebuild the settling ponds per the original design, modified to include extending the liner to the bottom of the pond and full-length of slopes. The existing clay liner will be used to the extent possible at the slopes and pond bottoms, and supplemented with new clay as needed to replicate the original design. The project includes various items such as excavation, aggregate base, hot mix asphalt, waterstop, concrete launder, asphalt dike, liner system, and more. The engineer's estimate for the project is $152,651. The selected vendor is Raminha Construction Inc, with a total bid amount of $297,600.00. Key aspects of the contract include: • Rebuilding of settling ponds • Extension of liner to the bottom of the pond and full-length of slopes • Use of existing clay liner and supplementation with new clay as needed • Various project items such as excavation, aggregate base, and hot mix asphalt • Engineer's estimate of $152,651 • Total bid amount of $297,600.00

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
2379
Solicitation №
300545

Contract value

$297,600

The contract's dollar amount value can be estimated based on the total bid amount, which is $297,600.00. This amount includes all the project items and services required for the reconstruction of the settling ponds. The engineer's estimate of $152,651 is lower than the total bid amount, but it is likely that the bid amount includes additional costs and services not accounted for in the engineer's estimate. Therefore, the estimated value of the contract is $297,600.00. Factors that may influence the likely contract value include the scope of work, the materials and services required, and the contractor's overhead and profit.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City and County of San Francisco·California

Top match · 72%

EXT REC | CON26-0030 Camp Mather InfrastructureRFQ

Closes 12/31/2026Opened 1/13/2026

City of Watsonville·California

72% match

Pinto Lake Dock Replacement Project

Closes 11/10/2026Opened 10/2/2026

West County Wastewater·California

71% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

U.S. Department Of The Interior·California

71% match

Y--LB Lateral Water Line and Facilities Replacement for Wastewater System

Closes 11/11/2026Opened 10/27/2026

San Bernardino County·California

71% match

Unit 2 Phase 5-2 Liner Construction Project at the San Timoteo Sanitary Landfill

Closes 11/12/2026Opened 10/27/2026

City of Hollywood·Florida

70% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Santa Clara Valley Water District·California

70% match

COYOTE-ALAMITOS CANAL SHOTCRETE REPAIRS

Closes 11/10/2026Opened 10/13/2026

County of Stanislaus·California

69% match

Turlock Lake State Recreation Dock Replacement

Closes 11/12/2026Opened 10/21/2026

County of San Luis Obispo·California

68% match

Nacimiento Water Project Unit G Repair Construction Management

Closes 11/3/2026Opened 9/29/2026

City of Hollywood·Florida

68% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

City of Plano·Texas

68% match

RFB Haggard Pond Restoration | Project No. PKR-D-00013

Closes 11/2/2026Opened 9/21/2026

City of Plano·Texas

68% match

RFB Haggard Pond Restoration | Project No. PKR-D-00013

Closes 11/2/2026Opened 9/21/2026

City of Farmington·New Mexico

68% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

City of Hollywood·Florida

68% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

Imperial Irrigation District·California

68% match

East Highline Reservoir Project

Closes 12/2/2026Opened 9/10/2026

U.S. Department Of The Interior·Colorado

68% match

LARO 258755 - Replace Dilapidated Docks and Fuel S

Closes 11/10/2026Opened 9/11/2026

Eastern Municipal Water District·California

68% match

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

U.S. Department Of The Interior·California

68% match

CA-SAN LUIS NWR-FIRE SYSTEM REHAB

Closes 11/30/2026Opened 10/29/2026

California Highway Patrol·California

68% match

Water Conservation Landscape Services - IFB 26C330002

Closes 11/6/2026Opened 9/9/2026

City of Ontario·California

68% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Redlands·California

68% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Casper·Wyoming

68% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

Town of Jupiter·Florida

68% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

California Department of Transportation·California

68% match

Smart Controller and Automatic Landscape Irrigation System Repair and Maintenance Services

Closes 11/10/2026Opened 10/22/2026

City of Riverside·California

68% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026