The Carlsbad Avenue / Yellowstone Lane Storm Drain Improvement Project involves the installation of approximately 900 lineal feet of storm drain pipe, six manholes, six drainage inlets, pavement restoration, and other work specified in the plans and specifications. The estimated construction cost is $550,000, and a General Engineering Contractor license is required. The contract was awarded to Caggiano General Engineering, Inc., with a total bid of $466,987.00.
• The project includes storm drain pipe installation, manholes, and drainage inlets.
• The estimated construction cost is $550,000.
• A General Engineering Contractor license is required.
• The contract was awarded to Caggiano General Engineering, Inc.
• The project is located in Sacramento, California.