The contract is for Americans with Disabilities Act (ADA) upgrades in Midway City, California. The scope of work includes constructing sidewalk, removing and replacing curb, gutter, and driveway approaches. The contract price is $262,521, and the contract duration is approximately 5 years. The contract requires the Contractor to perform at least 51% of the work with its own organization. The contract also includes provisions for liquidated damages, bonds, and insurance.
• The contract is a fixed-price contract with a total value of $262,521.
• The contract duration is approximately 5 years, with a start date of June 7, 2022, and an end date of June 6, 2027.
• The scope of work includes constructing sidewalk, removing and replacing curb, gutter, and driveway approaches.
• The contract requires the Contractor to perform at least 51% of the work with its own organization.
• The contract includes provisions for liquidated damages, bonds, and insurance.