The Jacksonville Port Authority (JAXPORT) awarded a fixed‑price contract for the demolition, concrete modification, electrical and network upgrades, and installation of new security guard booths at its two marine terminals in Jacksonville, Florida. The work includes removing existing booths, re‑routing power and data conduits, installing new concrete footings, and fitting new elevated booths (provided by JAXPORT) with associated IT equipment. An optional “Owner’s Option” allows for additional RPM lane booths at both terminals if exercised within 60 days of the Notice to Proceed. The contractor must comply with a broad set of codes (NEC, NFPA, ACI, FDOT, etc.), obtain all permits, submit detailed submittals, and provide a 120‑day performance schedule. The contract is a Firm‑Fixed‑Price, award‑by‑open competition, and includes liquidated damages for late completion.
• Demolition of four existing guard booths at TMT, concrete footings modification, and new conduit installations.
• Installation of four new elevated 4′×6′ security booths with electrical, network, and HVAC services.
• Optional scope for two additional RPM booths at each terminal, pending owner decision within 60 days.