This contract calls for comprehensive rehabilitation of approximately 18,400 linear feet of 8‑inch combined/sanitary sewer mains and laterals using Resin‑Cured‑In‑Place‑Pipe (CIPP) technology, the repair of 13 PVC sewer point locations, replacement of 286 linear feet of PVC pipe, and the monolithic lining of 935 vertical feet of existing manholes. The work will be performed across multiple municipalities in Connecticut, including the City of East Hartford, Town of Bloomfield, and other member towns of the Metropolitan District. The scope includes all labor, equipment, permits, and related costs, and requires the contractor to hold a current DAS Contractor Pre‑qualification Certificate for sewer and water lines. A mandatory pre‑bid conference was held on February 12 2020, and bids were due by March 4 2020. The award was finalized on June 8 2020.
• Rehabilitation of 18,400 ft of 8‑inch sewer main using CIPP.
• Additional work: 13 PVC point repairs, 286 ft PVC replacement, 935 ft monolithic lining of manholes.
• Mandatory pre‑bid conference and strict DAS pre‑qualification requirements for the prime contractor and any subcontractors over $500,000.
Attached files
The award documents live at the source — open the contract source above to download them.