The EL CAMINO AVENUE/VERNA WAY STORM DRAIN IMPROVEMENT PROJECT is a construction project that involves the installation of a new drainage pipeline in Verna Way, Roslyn Way, and Ione Street, near the intersection of El Camino Avenue. The project consists of installing 420 lineal feet of drainage pipe, one new storm drain manhole, two new drainage inlets, removing and replacing three storm drain manholes, removing and replacing four drain inlets, pavement restoration, and all other work specified on the plans and in the specifications. The engineer's estimate for the project is $450,500, and the bid price from Flowline Contractors, Inc. is $332,179.00. The project requires a Class A general engineering or Class C-34 pipeline contractor license.
• The project involves the installation of a new drainage pipeline and the removal and replacement of existing storm drain manholes and inlets.
• The project requires a Class A general engineering or Class C-34 pipeline contractor license.
• The engineer's estimate for the project is $450,500, and the bid price from Flowline Contractors, Inc. is $332,179.00.
• The project includes subcontractors, including Dryco Construction, Inc., Sierra National Asphalt, Jahn Engineering, Inc., Sierra Traffic Markings, Inc., and Whiting Concrete Construction.
• The project is located in Sacramento, California, and the bid submission date is March 25, 2021.