Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Construction
  5. ›N Moreland Blvd and Michigan Ave Traffic Signal…

Awarded contract·City of Waukesha·Wisconsin

N Moreland Blvd and Michigan Ave Traffic Signal Improvements-BT.pdf

$444kSingle Award
Contract source

Description

This contract concerns the design‑build upgrade of traffic signal infrastructure at the intersection of N. Moreland Boulevard and Michigan Avenue. The scope includes removal and replacement of existing curbs, gutters, sidewalks, and concrete medians; installation of new concrete curb, gutter, and sidewalk; pavement milling, hot‑mix asphalt patching, and base preparation; storm‑inlet protection and conduit work; and installation of city‑furnished traffic control equipment, signal cabinets, and related electrical hardware. An optional alternate allows for the abandonment of an existing hydrant assembly. The project is a fixed‑price bid, roughly $425 k for the base scope with an optional $9 k alternate, and a grand total (including adjustments) of about $444 k. Competing bidders were listed as “UofM” and “Zenith Tech Inc.” and LaLonde Contractors, Inc. appears as a bid submitter. The procurement was posted by the City of Waukesha and references Wisconsin Department of Transportation specifications, indicating a municipal‑state collaborative effort.

Attached files

Key dates

Bids closed
2/20/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310

Contract value

$444,000

The bid tabulation lists a Base Bid total of $424,970.02 and an optional Alternate #1 of $9,006.00, bringing the combined base‑plus‑alternate amount to $433,976.02. Adjustments for liquidated damages and pedestrian penalties reduce the subtotal to roughly $423,470. Additional line‑item totals (e.g., taxes/fees) appear to bring the final grand total to $443,946.86. Therefore the contract’s estimated value is approximately $444 k. This estimate assumes the final figure includes all mandatory fees and adjustments, and reflects the total amount the agency expects to spend on the awarded work.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

NYS Monroe County·New York

Top match · 71%

Traffic Signal Replacement: South Clinton Avenue @ Elmwood Avenue

Closes 12/1/2026Opened 10/29/2026

City of Bloomington·Indiana

70% match

3rd Street Traffic Signal Improvements S. Woodlawn Avenue & S. Hawthorne Drive

Closes 11/18/2026Opened 10/29/2026

City of Ankeny·Iowa

70% match

North Ankeny Boulevard & NW Reinhart Drive Traffic Signal and Turn Lanes

Closes 11/10/2026Opened 10/21/2026

Macomb County Department of Roads·Michigan

70% match

2026 Traffic Signal Modernization Phase II – Macomb County Department of Roads

Closes 11/13/2026Opened 10/16/2026

City of Charlotte·North Carolina

70% match

Traffic Signal Installation and Maintenance

Rolling / TBD closeOpened 12/31/2026

City of Redlands·California

69% match

Traffic Signal Head Improvements

Closes 11/16/2026Opened 10/22/2026

Monroe County·New York

69% match

Traffic Signal Replacement - South Clinton Avenue at Elmwood Avenue

Closes 12/1/2026Opened 10/31/2026

Los Angeles County Public Works·California

69% match

TDS0001709 San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

Texas Montgomery County·Texas

69% match

Traffic Signal Detection Upgrades (CSJ: 0912-37-267)

Closes 11/12/2026Opened 10/21/2026

California Department of Transportation·California

69% match

Modify the existing traffic control signals.

Closes 11/17/2026Opened 10/26/2026

City of Redlands·California

69% match

Church Street and San Bernardino Avenue Traffic Signal Installation

Closes 11/16/2026Opened 10/22/2026

County of Los Angeles Department of Public Works·California

69% match

TDS0001709 - San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

City of Clovis·California

68% match

Adaptive Signalization

Closes 11/17/2026Opened 10/22/2026

Maryland State Highway Administration·Maryland

68% match

PGA435176 - MD 414 (St. Barnabas Road) from IS 95 Ramp 2 to MD 5 Ramp 5 Safety

Closes 12/3/2026Opened 10/27/2026

Massachusetts City of Brockton·Massachusetts

68% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

City of Moline·Illinois

68% match

Ave. of the Cities & 53rd St. Intersection Project

Closes 11/10/2026Opened 10/25/2026

City of Fort Smith·Arkansas

68% match

TRAFFIC SIGNAL IMPROVEMENTS 25-09-A

Closes 11/10/2026Opened 10/21/2026

City of Cincinnati·Ohio

68% match

Traffic Signals Contract No.3

Closes 11/6/2026Opened 10/19/2026

LA Public Works Engineering Bureau·California

68% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

Connecticut Town of New Milford·Connecticut

68% match

Town of New Milford Grove St & Hine Hill Rd Signal Installation

Closes 11/5/2026Opened 9/18/2026

Town of New Milford·Connecticut

68% match

Grove Street and Hine Hill Road Signal Installation Project, LOTCIP No. L095-0006

Closes 11/5/2026Opened 9/18/2026

City of Cincinnati·Ohio

68% match

Traffic Signals Contract No.3

Closes 11/6/2026Opened 10/27/2026

Macomb County Department of Roads·Michigan

67% match

Innovative Traffic Signal Optimizations

Closes 11/3/2026Opened 10/7/2026

California Department of Transportation·California

67% match

RHMA, modifying signal and lighting systems and minor concrete.

Closes 12/2/2026Opened 10/26/2026

City of Fort Smith·Arkansas

67% match

Traffic Signal Improvements Phase A – 2024 Capital Improvements Program

Closes 11/10/2026Opened 10/25/2026