The Fair Oaks Boulevard Bicycle & Pedestrian Mobility Project - Phase 1 involves the furnishing of all labor, materials, and equipment for directional boring or trenching, replacement of curb gutter & sidewalk, construction of pedestrian signals with street lighting, installation of signal interconnect and other incidental work. The estimated construction cost is $600,000. The contract was awarded to Sierra National Construction, Inc. with a bid total of $744,869.00. Key aspects of the project include:
• Directional boring or trenching
• Replacement of curb gutter & sidewalk
• Construction of pedestrian signals with street lighting
• Installation of signal interconnect and other incidental work
• Estimated construction cost: $600,000
• Apparent low bid: $744,869.00 by Sierra National Construction, Inc.