Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Sutter Creek Road PM 8.1 and Pioneer Volcano Road PM 1.44…

Awarded contract·County of Amador - Purchasing Department·California

Sutter Creek Road PM 8.1 and Pioneer Volcano Road PM 1.44 Slope Repair Project

Won by SuuLUTAAQ Inc. +12 more$780kMultiple Award
Contract source

Awarded vendors

  • SuuLUTAAQ Inc.
  • Steelhead Constructors JV
  • Rock Morgan
  • Campbell Construction
  • R. Sutton Enterprises
  • Rehak General Engineering
  • B&M Builders
  • Philbin Construction
  • Sierra Mtn Const. Inc
  • K. W. Emerson Loc
  • JPB Designs Inc
  • Consolidated Eng Lnc
  • Ford Construction

Description

The Sutter Creek Road PM 8.1 and Pioneer Volcano Road PM 1.44 Slope Repair Project involves the furnishing of all labor, materials, and equipment for completion of slope repairs, including excavation, surface and subsurface drainage systems, rockery walls, geosynthetic reinforced embankments and walls, roadway construction, and traffic handling. The estimated construction cost is $780,050.00. The contract requires a Contractor License of Class A or C12. The successful bidder will be required to furnish a Performance Bond and a Payment Bond, each in an amount equal to 100% of the Contract price. • The project includes slope repairs, excavation, and roadway construction • The estimated construction cost is $780,050.00 • A Contractor License of Class A or C12 is required • The contract requires a Performance Bond and a Payment Bond, each in an amount equal to 100% of the Contract price

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
23-25

Contract value

$780,050

The estimated construction cost of the project is $780,050.00. However, the bid receipt log shows that the lowest bid received was $430,072.00 from Campbell Construction, and the highest bid was $1,667,647.00 from Steelhead Constructors JV. Considering the bids received, a reasonable estimate for the contract value would be around $780,050.00, which is the estimated construction cost.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Transportation·Arizona

Top match · 68%

AZ BL COLO 7528(1) Burro Creek Road

Closes 11/17/2026Opened 10/15/2026

County of Santa Cruz·California

68% match

Eureka Canyon Road PM 8.11 and 8.39 Storm Damage Repair Projects

Closes 11/5/2026Opened 10/8/2026

County of Santa Cruz·California

68% match

HIGHLAND WAY PM 5.60 AND 5.80 STORM DAMAGE REPAIR PROJECTS, FEDERAL PROJECT No. ER-15J2 (005 & 006)

Closes 11/5/2026Opened 10/8/2026

Massachusetts Department of Transportation·Massachusetts

68% match

616396 DISTRICT 1 Scheduled and Emergency Drainage, Slope, and Roadway Repairs/Improvements at Var

Closes 11/17/2026Opened 10/26/2026

Lewis County·Washington

68% match

Design and Engineering for Davis Lake Road MP 1.67 Slide Repair Project

Closes 11/13/2026Opened 10/8/2026

City of Huntsville·Texas

67% match

Bid NO. 27-07 Town Creek Branch Slope Repair

Closes 11/24/2026Opened 10/22/2026

U.S. Department Of Transportation·Wyoming

67% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

Texas City of Huntsville·Texas

67% match

Bid NO. 27-07 Town Creek Branch Slope Repair

Closes 11/24/2026Opened 10/22/2026

Town of Prosper·Texas

66% match

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of The Interior·Colorado

66% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

Nevada Government·Nevada

66% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Maryland Baltimore County Government·Maryland

66% match

26030 GX0 Old Frederick Road Slope Stabilization

Closes 11/5/2026Opened 8/29/2026

Siskiyou County California·California

66% match

Jackson Ranch Road Rehabilitation

Closes 11/11/2026Opened 4/24/2026

City of Rancho Cordova·California

66% match

Bridge Preventative Maintenance Repair At Horn Road

Closes 11/2/2026Opened 10/8/2026

U.S. Department Of Veterans Affairs·California

66% match

Y1LB--FY27 NRM - Correct Mather Loop Road and Install Speed Bumps

Closes 11/2/2026Opened 10/26/2026

U.S. Department Of Agriculture·Montana

66% match

Custer Gallatin National Forest Ashland and Sioux Road Maintenance

Closes 11/10/2027Opened 10/29/2026

County of Santa Cruz·California

66% match

Upper East Zayante PM 1.18 Storm Damage Repair Project

Closes 11/12/2026Opened 10/15/2026

U.S. Department Of Transportation·Colorado

66% match

CO BR UCPO Blue Mesa Road(1) Blue Mesa Road

Closes 12/1/2026Opened 10/27/2026

County of Santa Cruz·California

66% match

SOQUEL SAN JOSE RD PM 5.55 STORM DAMAGE REPAIR PROJECT, FEDERAL PROJECT No. ER-15J2 (004)

Closes 11/5/2026Opened 10/8/2026

California Department of Transportation·California

66% match

Mod Sig & Ltg, Pvmt repair, SW, curb ramp, segmental Conc Ret system.

Closes 11/5/2026Opened 10/5/2026

U.S. Department Of Transportation·Idaho

66% match

ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1

Closes 10/7/2028Opened 10/7/2026

U.S. Department Of Agriculture·Utah

66% match

Yellow Lake Disaster Relief Project – Watershed / Uinta-Wasatch-Cache NF

Closes 11/9/2026Opened 10/30/2026

Nevada Government·Nevada

66% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

65% match

DOT&PF Notice of Geotechnical Investigation: Ketchikan Tongass Avenue & Water Street Viaducts

Rolling / TBD closeOpened 8/17/2026

Town of Prosper·Texas

65% match

Coit Road Paving and Drainage Improvements (Prosper Trail-1400' North of Frontier), CIP 2534-ST

Closes 11/5/2026Opened 10/9/2026