This contract is a performance‑based Energy Conservation Project for Hopkinton High School, targeting the town’s Net‑Zero 2045 goals. The scope requires the selected ESCO to design, install, and manage energy‑saving measures, guarantee measurable savings, and provide measurement‑and‑verification services. The RFQ process attracted five qualified bidders, and the school district has chosen CMTA as the preferred awardee. The effort will likely encompass whole‑building energy audits, HVAC and lighting retrofits, renewable integration, and ongoing operations‑and‑maintenance support to achieve the required emission reductions.
• Performance‑based contract with guaranteed energy savings.
• Comprehensive services: design, installation, commissioning, M&V, and long‑term O&M.
• Alignment with Hopkinton’s Net‑Zero 2045 roadmap (50 % reduction by 2030, 75 % by 2037).