The contract is for the Hagen Road Line Distribution Conduit System project, which involves extending the conduit system from the 15 kV utility distribution Snyder Substation facility and along Hagen Road in the City of Richland, Washington. The project includes trench excavation and backfill, conduit installation, and vaults and lids. The engineer's estimate for the project is between $150,000 and $230,000. The contract was awarded to multiple vendors, with the lowest bid being $135,614.17. The contract includes a sales tax of 8.6%. The project is expected to be completed within a certain timeframe, but the exact duration is not specified.