The City of Napa is seeking a contractor to replace the Alta Heights 2 pressure tank. The work includes removing and disposing of the existing tank, furnishing and installing a new 7,600-gallon hydropneumatic pressure tank, and tying it into the existing water system. The contract also includes mobilization, worker protection and safety, traffic control, and erosion and sediment control. The engineer's estimate for the project is $225,000.00. The contract was awarded to Euro Style Management and Valentine Corporation, with bid prices of $293,000.00 and $367,369.00, respectively.
• The project involves replacing a pressure tank in a location with significant site constraints, including limited space, steep slopes, and rocky ground.
• The contractor will be responsible for proposing means and methods to complete the work, including onsite excavation and regrading if necessary.
• The existing tank contains lead-based paint, and the contractor must follow lead abatement practices in accordance with CAL-OSHA Title 8, Section 1532.1 and CDPH Title 17 CCR.
• The contract includes a bid bond, and the contractor must provide a subcontractor list, non-collusion affidavit, and local business form.
• The project is subject to an affirmative action program.