This contract (T200.727) concerns the replacement or upgrade of guide rails along a 2.7‑mile stretch of the New Jersey Turnpike between mileposts 119.3 and 122. The work is expected to involve demolition of existing rail sections, installation of new safety rail systems, and associated site preparation and traffic management.
• Scope: Guide‑rail removal, new rail installation, and related civil works.
• Location: New Jersey Turnpike, Milepost 119.3‑122 (approximately 2.7 mi).
• Procurement: Issued by the New Jersey Turnpike Authority; details posted on the BIDX NJTA letting portal.
Attached files
The award documents live at the source — open the contract source above to download them.