The contract is for the installation of a natural gas 150KW generator at the FSU Presidents House. The contractor will provide all labor, materials, and equipment necessary to complete the installation. The project is expected to start upon issuance of a PO and be substantially completed by June 28, 2019. The contract was awarded to All Florida Electric Of Tallahassee with a base bid of $80,200.00.
• The project involves the installation of a natural gas 150KW generator.
• The contractor will provide all labor, materials, and equipment necessary to complete the installation.
• The project is expected to start upon issuance of a PO and be substantially completed by June 28, 2019.
• The contract was awarded to All Florida Electric Of Tallahassee.
• The base bid for the contract was $80,200.00.