The City of Port Arthur has awarded a contract to W & W Construction for utility cut repairs for concrete slabs at various locations throughout the city. The contract is for one year, with a maximum amount of $60,000. The contractor will provide all labor, equipment, and materials necessary to perform the repairs. The city will submit a list of repair locations, and the contractor will commence work within 48 hours of notification.
• The contractor will remove backfill material from the repair area to a depth of six inches for four-inch slabs and eight inches for six-inch slabs.
• The contractor will saw-cut patched areas to straight, neat edge lines.
• The contractor will notify residents prior to construction and commence repair operations within 48 hours of notification.
• The contractor will barricade the construction area at non-working hours.
• The city will pay the contractor based on unit prices for each type of repair.