This solicitation seeks a contractor to seal and rehabilitate two municipal bridges – the W Sunset Drive Bridge and the Barstow Street Bridge – located in Waukesha, Wisconsin. The base scope includes traffic control, inlet protection, deck surface cleaning, protective treatments, epoxy joint and crack sealing, methacrylate flood sealing, low‑viscosity crack sealing, pavement marking, and removal of existing markings, with a liquidated‑damages provision of $500 per day per bridge. Two optional alternates add demolition of existing curb, gutter, sidewalk, and roadway, followed by new concrete pavement, curb & gutter, sidewalk, and a large concrete approach slab replacement for the Sunset Bridge (Alternate #1) and a concrete crack epoxy injection for the Barstow Bridge (Alternate #2). Bids were received from Norcon Corporation and Zignego Company, Inc., with total estimated costs ranging from roughly $108 k to $162 k (base) and up to $256 k‑$292 k if both alternates are exercised. The procurement was conducted as a full and open competition, but no award decision has yet been announced.
• Base work: deck cleaning, surface treatment, epoxy & methacrylate sealing, pavement marking, and traffic control.
• Optional Alternates: major concrete demolition and new construction (approach slab, curb, gutter, sidewalk).
• Liquidated damages: $500 per day per bridge.
• Bidding deadline: 10 April 2026, 11:00 AM CDT.