This contract is for the construction of the UNG Camp Williams Restoration of 3000 Series Nonorg Parking & Drainage project. The project involves removing and replacing existing asphalt, importing engineered fill, regrading as required to manage storm water, improving the existing storm system, and upgrading existing lighting to meet current UFC standards. The base bid must include an allowance of $150,000.00. The construction cost estimate is $2,000,000.00. The contract was awarded to six vendors: Pronghorn Construction Inc, Black Forest Paving, Geneva Rock Products, Staker Parson Companies, Acme Construction, and Lyndon Jones Construction, Inc.
* Key aspects of the project include:
* Removing and replacing existing asphalt
* Importing engineered fill and regrading as required to manage storm water
* Improving the existing storm system
* Upgrading existing lighting to meet current UFC standards
* Base bid must include an allowance of $150,000.00
* Construction cost estimate is $2,000,000.00
* Awarded to six vendors