This contract concerns the design‑build installation of a new water distribution system along Headland Avenue in Dothan, Alabama. The scope includes the supply and installation of multiple types and sizes of water mains (copper, PVC, ductile‑iron), associated appurtenances, fire‑hydrant assemblies, valve‑manhole removal and replacement, and extensive civil works such as asphalt and concrete removal/replacement. The base‑bid value (including tax) is approximately $2.0 million, with two optional alternates adding roughly $47 k total. Two local contractors submitted competitive bids, but the award winner is not identified in the available documents. Key points:
• Scope: ~150 ft copper, ~2,970 ft PVC (SDR‑21), ~8,300 ft PVC (6 in), ~2,380 ft ductile‑iron (6 in), ~435 ft PVC (8 in) plus related civil infrastructure.
• Estimated contract value: ~$2.06 million (base + alternates, tax‑inclusive).
• Procurement method: Open competitive bidding via the City of Dothan’s purchasing system.