The Gerber Creek Phase 3 Improvement Project involves the widening and deepening of approximately 2,060 linear feet of the existing creek, resulting in a reduced flood plain and allowing for future development. The project includes excavation, tree removal, bridge construction, and other work. The contract was awarded to Suulutaaq, Inc. for a total bid amount of $2,442,695.50.
• The project is located in Sacramento County, California.
• The project involves the construction of a new bridge and the removal of an existing bridge.
• The project includes the excavation of approximately 43,000 cubic yards of soil.
• The project requires the removal of approximately 95 trees.
• The project involves the construction of a new outfall structure.
• The project requires the relocation of an existing utility pole.