The total value of the contract can be estimated by summing up the costs for each group. The costs are as follows: Group A-t: $14,800.00 (Lark Group, Inc.), $19,050.00 (MLG Construction), $23,700.00 (James W. Turner Construction, LTD) Group B-t: $17,800.00 (Lark Group, Inc.), $13,050.00 (MLG Construction), $27,200.00 (James W. Turner Construction, LTD) Group C-t: $13,600.00 (Lark Group, Inc.), $12,100.00 (MLG Construction), $24,800.00 (James W. Turner Construction, LTD) Group D-t: $25,900.00 (Lark Group, Inc.), $26,150.00 (MLG Construction), $32,400.00 (James W. Turner Construction, LTD) The total cost for each vendor is: Lark Group, Inc.: $14,800.00 + $17,800.00 + $13,600.00 + $25,900.00 = $72,100.00 MLG Construction: $19,050.00 + $13,050.00 + $12,100.00 + $26,150.00 = $70,350.00 James W. Turner Construction, LTD: $23,700.00 + $27,200.00 + $24,800.00 + $32,400.00 = $108,100.00 The lowest total cost is $70,350.00 (MLG Construction), and the highest total cost is $108,100.00 (James W. Turner Construction, LTD). Since the contract was awarded to multiple vendors, the total value of the contract is likely the sum of the costs for each group, which is $72,100.00 + $70,350.00 + $108,100.00 = $250,550.00. However, this is just an estimate, and the actual value of the contract may be different.