The contract concerns the flood‑damage repair of Thomas Creek Bridge #642 in Snohomish County, Washington. The work includes site preparation, mobilization, grading, installation of a rock‑wall drainage system, stream‑bed mix placement, temporary stream and storm‑water diversion, permeable ballast surfacing, extensive erosion‑control and native‑planting measures, temporary traffic control, structural excavation, roadside cleanup, environmental compliance (SPCC plan and habitat logs), and a $3,000 COVID‑19 force‑account item. Oceanside Construction, Inc. was awarded the contract on August 31 2020 after a competitive bidding process that closed on August 18 2020. The award follows requirements for a 5 % bid bond, Federal‑Aid certification, non‑collusion declaration, wage‑payment compliance, and Under‑Utilized Disadvantaged Business Enterprise (UDBE) participation.
• Scope: comprehensive civil‑engineering repair of bridge and associated roadway, including earthwork, drainage, erosion control, and environmental mitigation.
• Budget: the awarded bid is approximately $1.03 million (based on the Oceanside proposal).
• Requirements: 5 % bid bond, multiple certifications, UDBE documentation, and compliance with federal‑aid and wage statutes.
• Timeline: bid submission deadline August 18 2020; award date August 31 2020; project start shortly after award.